CIM Valles, Santa Perpetua M. BCN (new)

CROSSDOCKING BUILDING REFURBISHMENT

  • Refurb. X-dock for Lorries into “Courier bldg.”:
  • Transform Lorry docks into Van positions
  • Cross Docking cell with sorter: 19.000 m²
  • Offices “built in tower” mezzanine: 500 m²
  • Execution time: 6 months
  • Delivery: January, 2021

TURNKEY OPERATION

  • From Design to realitzation (CPI)
  • Owner: PROLOGIS
  • Engineer: TBS
  • 19.500 m²
  • 2021
Scroll up