E. CIM Valles, Santa Perpetua M. BCN (new)

CROSSDOCKING BUILDING REFURBISHMENT
- Refurb. X-dock for Lorries into “Courier bldg.”:
- Transform Lorry docks into Van positions
- Cross Docking cell with sorter: 19.000 m²
- Offices “built in tower” mezzanine: 500 m²
- Execution time: 6 months
- Delivery: January, 2021
TURNKEY OPERATION
- From Design to realitzation (CPI)
- Owner: PROLOGIS
- Engineer: TBS
- 19.500 m²
- 2021