Porcelanosa, VALENCIA

HIGH ROTATION WAREHOUSE

  • Very narrow aisle(VNA) storage 7.900 m2 cell
  • Precast piles 23m deep
  • 60cm thick slab for heavy loads (12T on plate)
  • TR34 superflat slab above piled slab
  • Very narrow aisle (VNA) storage
  • Deadline: Phase 2 / 11 months
  • Delivery: DECEMBER 2013

TURNKEY OPERATION

From Design (CEP) to Completion (CPI)

  • Owner: Novocer
  • Architect: Armengot Falco Engineering
  • 7.900 m²
  • 2013