C.L.A., Madrid

LOGISTIC BUILDING REFURBISHMENT

  • Project complying with IATA regulations on air freight: handling of goods and maneuvering of vans&trucks should be inside the warehouse: Reinforced air renewal&fire fighting equipment.
  • Special docks & conveyors for Aerios Alum. containers were installed by CUBIC for handling.
  • Deadline:5 months
  • Delivery:April 2012

FULL TURNKEY REFURBISH.

  • From Design (IDEAS CONTEST)
  • to Completion (CPI)
  • Owner: AXA REIM
  • Architect:Soluciones Transparentes
  • 3.200 m²
  • 2013
  • FedEx CLA
FedEx CLA
Scroll up