Arras

AUTOMATED COLD LOGISTIC BUILDING

  • Works executed with full activity of site
  • 2 cells FRESH & COLD – 16 800 m²
  • 2 HBW : 2 x 6000 m² – 30m HIGH
  • 1 Buffer ( 23m HIGH )
  • Automated process of existing building: traditional to fully
    automated process with colaboration of Witron»

DESIGN & BUILD FULL TURNKEY REALISATION

  • Maitre d’Ouvrage: LECLERC
  • Integrator:WITRON
  • 37 000 m²
  • 2019
  • Arras side
  • E.Leclerc
  • Arras up
Arras side E.Leclerc Arras up
Scroll up